The proposal is to cover a 35.5 x 20.5 meters sports concrete track. Most of the sports that can be developed in a track of these dimensions demand a 7 meters vertical clearance. To the difficulty to solve the structure and with limited financial means, is added to insert the piece in a place of great landscaping quality. To solve these requestings from the economy of means and gestures is the main challenge of the proposal.
Customer: Ajuntament de Palafolls
Architects: Rubén A. Alcolea / Jorge Tárrago Technical Arq.: Andrés Alcolea Garrido
Collaborator: Emetal Estructuras Metálicas SL Constructor: Agustí Obres i Muntatges Industrials SL
Project date: Aug 2006 End date: Oct 2007